design lab

blog

Blog about architecture, design, design theory, culture, writing, film, travels, and more.

Warehouse / office building near completion

The logistic centre of a major clothing brand we have been working on for some time is near completion. The building features 3 m tall glass walls running the entire length of both of the 150 m long facades. A balcony will be added above the main entrance.

Anders Brix